Preliminary Engineering Report for a Water System: Who Pays?

Before most funders will consider a water or wastewater project, they want a preliminary engineering report. For a small system with a volunteer board, the first question is often a plain one: who pays for it, when you have no award yet? This guide explains what the report is, what it covers, and the ways rural systems pay for it.

Talk with our team

Before the engineer starts: ask your funder which report format it wants and how engineers must be selected. Doing it in that order keeps you from paying for the report twice.

What a preliminary engineering report is

A preliminary engineering report, often called a PER, is a study by a licensed engineer. It looks at your existing system, explains what is failing or falling short, compares the realistic ways to fix it, and recommends one. It also estimates what the project will cost and what it will mean for customer rates.

Think of it as the project’s business case. Funders use it to decide whether the project makes sense, and your board uses it to decide whether you can afford it.

What a PER usually includes

  • A description of the system today: lines, wells or intake, treatment, storage, pumps and the area served
  • The problem: compliance issues, leaks, water loss, capacity, age or failing equipment
  • Options for fixing it, with a cost estimate for each
  • The recommended option and why
  • A project cost estimate and a proposed schedule
  • What the project will do to monthly rates, and whether the system can repay a loan
  • Environmental and permitting items that apply

Many funders follow the same format, based on the USDA Rural Utilities Service template known as Bulletin 1780-2. Ask your funder which format it wants before the engineer starts, so the report is written once.

Who pays for the report

There is no single answer, and the right mix depends on your system, your state and your timing. Rural systems usually pay in one of four ways:

  1. From the system’s own cash. This works when reserves exist and the report is small. Many small systems do not have that cushion.
  2. A planning or predevelopment grant. Some federal and state programs pay part or all of the cost of planning work for very small or lower-income communities. Programs, limits and open dates change, so confirm them with USDA Rural Development and your state water agency before you count on one.
  3. A pre-development loan. You borrow to pay the engineer now and repay the loan from the grant or loan funding the project receives. This is the gap that Communities Unlimited fills.
  4. A mix. A system might use a small grant for part of the report and a loan for the rest.

How a Communities Unlimited pre-development loan works

Our pre-development loan is interim financing for the early costs of a water or wastewater project, including engineering and audits. In plain terms:

  • It is meant to be repaid in full from grant funding sources once they are secured.
  • It is for existing water and wastewater systems, not private entities, in a rural area, town or community with a population not above 10,000.
  • The project must meet the intended-use guidelines for eligible entities and projects.
  • The system’s revenue is the collateral, and monthly interest payments are made by automatic draft.

If you are wondering what happens if the award does not come through, ask us before you sign. It is better to know the repayment picture at the start. Our loan officers will walk through it with your board.

We also offer loans for required audits and reports, which many funders ask for alongside the PER.

Before you hire an engineer

  • Ask your funder how engineers must be selected. Federal and state programs often have procurement rules. Hiring the wrong way can put your funding at risk.
  • Define the scope in writing. A report for a single well replacement is not the same as one for a full system.
  • Get more than one quote when the rules allow it. Compare what each includes, not just the total.
  • Ask who owns the report. You should be able to share it with any funder.
  • Bring your board in early. The report will drive a vote on rates and debt.

Costs vary a great deal with the size of the system and the scope of the work. We do not quote a typical price here, because a wrong number would mislead a board planning a budget. Your engineer’s written scope and fee are the numbers that count.

Where to go next

To see how a rural system lines up a USDA or state award, start with our guide on how to fund a rural water system upgrade and our funding guide. Stories from systems we have worked alongside are below.

Talk with us about your project

We work alongside rural water and wastewater systems in Alabama, Arkansas, Louisiana, Mississippi, Oklahoma, Tennessee and Texas. If you are weighing a project, our Community Infrastructure team can talk through whether you are ready for a PER and what to line up first. Call (479) 443-2700 or email info@communitiesu.org.

Related guides: drinking water violation notice, water board member responsibilities, how to set water rates, water system consolidation.

Talk with our Community Infrastructure team

It takes about two minutes. Tell us about your project and we will follow up by phone or email.

This field is for validation purposes and should be left unchanged.
Your name(Required)
Add a number if you would rather we call.
A short note is plenty. For example: you got a notice, you have a project in mind, or your board is new.

Prefer to talk first? Call (479) 443-2700 or email info@communitiesu.org.

Common questions about preliminary engineering reports

It is a study by a licensed engineer that describes your system, the problem, the options for fixing it, the recommended option, and the estimated cost and effect on rates. Funders use it to decide whether to support a project.

Most larger projects do. Requirements differ by program and project size, so ask your funder what it needs before you hire an engineer.

Sometimes. Some planning and predevelopment programs cover part or all of the cost for eligible small communities. Check current rules and open dates with USDA Rural Development and your state water agency.

Yes. A pre-development loan from Communities Unlimited finances engineering and other early costs, and is meant to be repaid from the grant or loan funding your project receives.

It depends on the size of the system and the scope. Ask your engineer for a written schedule, and ask your funder about any deadlines it sets.

How other systems got started

Winslow, Arkansas, the first Communities Unlimited pre-development loan in the state

Pre-development loan

Winslow

Washington County · Arkansas

Winslow’s 35-year-old water system had grown from 237 connections to about 670, and the city needed engineering work to connect to a water source with enough capacity. In 2023 it received the first Communities Unlimited pre-development loan in Arkansas to cover those engineering costs.

"We’re at a point where we have a relationship; it’s pretty cool stuff." — Mayor Randy Jarnagan

Read Winslow’s story →

Zavalla, Texas, where a completed audit opened the door to state water funding

Audit and funding readiness

Zavalla

Angelina County · Texas

Zavalla’s water system had been failing for years, and the city lacked a clear financial picture and a completed audit. Starting in October 2025, our finance team worked alongside city staff to restore the financials and complete the audit, which unlocked about $5.5 million in state funding to rebuild the system.

Read Zavalla’s story →

Our Promise

To partner with people who want to escape from persistent poverty and connect them to solutions for achieving sustainable prosperity.

Our Purpose

Talent is equally distributed across the U.S. and opportunity is not. Access to opportunities should not depend on where you live, how much you have in the bank or what you look like.

Our Approach

Through human connection and ingenuity combined with cutting-edge technology and expertise, Communities Unlimited connects people to solutions that sustain healthy businesses, healthy communities, and healthy lives.

Let's stay in touch

Newsletter Signup

Communities Unlimited, Inc.
3 East Colt Square Drive
Fayetteville, AR  72703

P (479) 443-2700
F (479) 443-5036

This institution is an EOE Disability/Veteran employer, provider, and lender.
Persons with speech or hearing impairment may call toll-free 1-800-877-0996 for service in English and Spanish